Delhi Noida Bridge

Key Facts

• FPCC Completed Delhi Noida Bridge project in just 8 months.

• Length of corridor was 806m.

• FPCC used 27K15 Prestressing System.

• FPCC has used 425 MT High tension strands.

• Project Status is completed.

 

 

Case Studies

Project: Delhi Noida Bridge


Details: The decking of this bridge was constructed by precast segmental construction. It was post-tensioned by 27K15 Freyssinet external tendons which were used for the first time in the country at that time.

 