Repair and Rehabilitation

Projects

 

 

Case Studies

Completed Projects

This bridge is situated on Behrampur-Raigada State Highway No.4 in Orissa. There are 9 spans of 104 ft. each and 2 end spans of 35 ft. with floating spans of 5 ft.

The sutlej bridge is located over canal in Punjab. Canal was used for irrigation purpose.

The bridge is located on a State Highway near Thevally town in Quilon district.

Jui Creek Bridge is a link between Old Bombay and New Bombay.

Mahanadi Bridge is situated on NH-5A between Chandikhol and Paradip in Orissa State.

Sharavathi Bridge constructed in sixties, is situated on NH-14 near Honnavar in Karnataka State.

This bridge situated on NH-17 near Panjim in Goa across River Zuari over the estuary portion is 810 M.

This bridge is one of the longest bridges in Asia having 45 spans of 121 Meters and 2 end spans of 63.5 M. each.

The 550 M. long 4 lane Nizamuddin Bridge on NH-24 bypass connects the Ring Road at Delhi to trans-Yamuna areas.

This bridge spanning a deep valley is located on Jammu Srinagar Highway situated in the Himalayan terrain which is prone to landslides.

This stone arch bridge is located near Thane Railway Station on Central Railway. Two arch bridges on Thane-Kalwa Section had suffered distress due to ageing.

The bridges were more than 100 years old, and were located along a stretch of 109 km.

There are 2 prestressed bridges spanning the Cauvery River with 47 spans in all.

Two raw meal silos constructed in RCC in the year 1983 for a capacity of 5500 M.T. suffered heavy damage due to vertical cracks, spalling etc..

In a major cement plant with a capacity of 1.2 million Tons, one of the four silos tilted excessively when cement was being loaded in it.

Indira Sagar Dam is situated in Narmada Nagar near Khandwa, Madhya Pradesh. It belongs to the National Hydro Project Development Corporation Ltd.

Hirakud dam is one of the major dams in India situated across River Mahanadi in Orissa near Sambalpur.

Chamera Dam is across River Ravi and its generation capacity is 540 MW.

Berthing facilities for cargo ships were constructed in 1964. Kandla is a natural all-weather port and is newly established.

There are two jetties built by Narmada Cement at Jaffrabad near Diu and these were commissioned in 1980.

Installation of Lord Buddha statue carved out of monolithic granite weighing 300 Tonnes was a challenging feat.

Two water tanks of 23,500 Litres and 1,95,000 Litres capacity weighing 70 M.T. and 240 M.T.

7 elements of boiler supporting structure of total weight 450 Tonnes i.e. 4 corner pieces weighing 64 tonnes each and 2 crown girders

The steel columns supporting the first floor of the Gymkhana building had corroded below the ground level on account of seepage of water.

In 1991 fire broke out on the fifth floor of 'Alok Bharati' building of Bhubaneswar Development Authority basically a Commercial Complex Housing of leading reputed companies.

FPCC LTD.
Tel : +91 22 4322 9500
Address : 6/B, 6th Floor, Sterling Centre, Dr.Annie Besant Road, Worli 400 018, Mumbai, India
Email: freyssinet@fpccindia.com
© FPCC LTD.